stacks_image_5036B9AE-5832-49DF-B6CA-29B2D32FE9EA

Survey - Upper Ground Floor

stacks_image_FFCBF70D-AB17-46D1-85F8-062D0F3D3A78

Proposed Second Floor

stacks_image_9240AE1F-DE7E-41AC-9F86-845C765BF9B5

Survey - Ground Floor

stacks_image_9B5DB2A8-202C-478A-AFB2-57F5AA0B385B

Proposed First Floor

stacks_image_F67CF44B-1E0B-453D-B5BE-76CB51F2A993

Survey - First and Second Floors

stacks_image_145D592D-A8FA-49C5-A60B-294B540E9D85

Proposed Ground Floor

stacks_image_64E080FA-AD6D-4067-B3D2-6662C94230EB

Proposed Upper Ground Floor

stacks_image_D301CB8F-E43B-40B4-B77B-386DADDC458B

Proposed First Floor (flexible)

June 2010


 
At last we can launch the First Draft of the plans. Please feel free to contact us to get filled in with further understanding as to why something is here or not here.
 
Broadly we are limited by a number of constraints:

  • Keeping the cost down to “around the same as the Whitworth Centre, Darley Dale” - £1.5m.
  • Keeping as much of the Ballroom, Wing Rooms and Stage Area unchanged.
  • Providing a Theatre AND an open space for other activities.
  • Providing Disabled Access.
  • Providing a Goods Lift (the position of the doors in this design is not right).
  • Providing adequate storage space for chairs, movable staging pieces and other items.
  • Providing enough loos for Theatre (60% of the audience are female, I space for every 20 plus 1) This means that for 400 people we needed 13 Female loos and about 3 for males!

Click on the images below to view each plan.

stacks_image_848A4ADB-9F5B-49EC-98CC-8A696CEA32F8
stacks_image_28CBAB6A-C1D7-4E4D-A142-7842DDF62236

April 2010

Here are our CAD drawings that we are now working on. Click on an image to see more.